Deutsch
400

Production facility

The 70.000 m² factory site is located in the modern industrial region of Unterwölbling in a quarry that was shut down 50 years ago. Surrounded by vineyards and fields the factory is divided into pulverizing, classifying and crushing facilities, mixing tower, press equipment for cupola furnace briquettes, a production facility for fireproof finished parts, storage and shipping, as well as a mechanic's shop and a social building.

The storage capacity includes:

  • 24 tower silos for 550 t of fines
  • 7.000 m² hall surface area with approx 1.200 palette spaces
  • Storage boxes in the hall for approx 3.000 t of bulk material
  • Covered outside storage area for approx 1.000 t of bulk material